[wpvr id=”12764″ Width=100% Height=800px]
The Transformation:from Dream to Reality
![](https://www.caisbv.edu.hk/wp-content/uploads/2021/03/desktop.jpg)
![](https://www.caisbv.edu.hk/wp-content/uploads/2021/03/Phase-2.jpg)
Gymnasium
A court built to FIBA (The International Basketball Federation) regulations for basketball competitions, including a rock-climbing area with an auto-belay system. The 4th floor is equipped with high-performance training facilities for basketball coaching, judo practice, ballet classes, etc.
![](https://www.caisbv.edu.hk/wp-content/uploads/2021/03/4.png)
![](https://www.caisbv.edu.hk/wp-content/uploads/2021/03/1.png)
Ground Floor Multi-purpose Space
A half-covered multi-purpose space extended to a courtyard landscape and green spaces will be available for students to meet, connect and learn. It is part of the network of circulation space surrounding a café where parents and visitors will be able to enjoy refreshments and unwind while experiencing the dynamic and vibrancy of the school.
![](https://www.caisbv.edu.hk/wp-content/uploads/2021/03/09.jpg)
Ground Floor Multi-purpose Space
A half-covered multi-purpose space extended to a courtyard landscape and green spaces will be available for students to meet, connect and learn. It is part of the network of circulation space surrounding a café where parents and visitors will be able to enjoy refreshments and unwind while experiencing the dynamic and vibrancy of the school.
![](https://www.caisbv.edu.hk/wp-content/uploads/2021/03/09.jpg)